ČERNAY AGRO
Complex implementation of 100kWp photovoltaic system
Projection
Projection
Photovoltaic power plant with installed power of 82 kWp achieves annual solar gain of 91 MWh.
From the total annual consumption 496 MWh the PV system will save 14 %
Total consumption of CO₂ emissions of volume 12.921 kg will be reduced by 7.950 kg which represents the volume of emissions that has to be absorbed 321 mature trees.
Annual electricity costs of 63.488 Eur are lowered by more than 8.900 Eur
Return of investment achieved 6 years .