Until now, we saved our clients  Quick contact

14.647.425
50.455
Tons of emissions CO₂
0100909,818
MWh

KROMBERG & Schubert s.r.o.
Design and delivery of a 70.52 kWp photovoltaic power plant

Comprehensive implementation of a photovoltaic system

Solution

  • Preparation of a local operational regulation for the PV power plant according to the requirements of the distribution system operator
  • Professional realization/execution of the work
  • Training and commissioning/start-up
  • Solution based on high-efficiency panels with 21.3% efficiency
  • Ultralight aluminum structure with East-West orientation
  • Use of Smart Optimizers
  • 25-year warranty on linear panel performance